About Project
The Government of India had entrusted to the Authority the development, maintenance and management of National Highway No. 544D including the section from existing km 39.380 (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of NH 544D (approx. 32.00 km). The Authority had resolved to augment the existing km 39.380 (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of NH 544D (approx. 32.00 km) section of Muchukota – Bugga in the state of Andhra Pradesh by Four laning on design, build, operate and transfer (the “Hybrid Annuity”) basis. The pavement is entirely of flexible type and rigid type at Toll Plaza.
Note: The duration for the construction of the project is 730 days from the appointed date with 15 years of operation and maintenance period.
Scope of the Project

30/7 No’s
Box/Pipe Culverts
10 No’s
Vehicular Underpass
2 No’s
Light Vehicular Underpass

10/1 No’s
Minor Bridges/Widening

2 No’s
Major Bridge
Project details and Timeline
4 Lanning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Muchukota – Bugga section of NH-544D on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh.
| Role/Type | Details |
|---|---|
| EPC Contractor | M/s. Megha Engineering & Infrastructures Limited |
| Independent Engineer | M/s. Satra Services and Solution Pvt. Ltd |
| Agreement Date | 03rd Feb 2023 |
| Appointed Date | 17th Aug 2023 |
| Maintenance Period | 15 Years after commencing |
| COD Construction Period | 24 Months (730 days) from Appointed Date |
| Project Cost | 733.35 Crs. |
Project highlights
- 4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000)
- Comes under design, build, operate and Transfer (the DBOT Annuity or Hybrid Annuity).
- Part of Anantapur-Guntur National Highway.
- Design speed of section is 100kmph.
- Provides safe travel and reduce travel time.
Recent updates
Progress Photographs During 3rd week of July-2026
MCW DBM laying work in progress @43+140 to 43+480 LHS Ch 53+400 ROB LHS A2 side P2-A2 deck slab BE…
Progress Photographs During 2nd week of July-2026
MCW wmm laying and rolling work in progress @43+140 to 43+340 LHS W2 closing panel errection work started from 44+320…
Progress Photographs During 1st week of July-2026
Ch 39+940 MJB A1-P1 LHS girder erection work in progress LHS ROB -53+400-Transverse pushing/ slewing work completedLHS ROB -53+400-Transverse pushing/…
Project photos